# Hyperdome upgrades

> Precise Air undertook the first of 5 major plant upgrades (SR-1) in 2014. Since then we have completed two other upgrades (SR2 and SR4), with SR-5 now underway....

Source: https://www.airgene.com.au/project/hyperdome-upgrades

Project Profile

# Hyperdome upgrades

Project details

**Project:** Multiple system upgrades

**Location:** Brisbane

**Client:** QIC

**Date:** 2022

**Services:** Mechanical services, System Upgrade

![Hyperdome upgrades](https://assets.precisecdn.com/cdn-cgi/image/width=700,height=520,fit=cover,quality=80,format=auto/Hyperdome.jfif)

Precise Air undertook the first of 5 major plant upgrades (SR-1) in 2014. Since then we have completed three additional upgrades (SR2, SR4, SR5).

All projects were carried out in a ‘live’ environment. During the replacement of major air conditioning plant it was imperative that QIC and their tenants were satisfied with temperature conditions and comfort levels for their customers.

The SR projects included decommissioning and removing major refrigerant plant and replacing with new chilled water plants including new Powerpax chillers, pumps, and chilled water loop.

Share:[](https://www.facebook.com/sharer/sharer.php?u=https%3A%2F%2Fwww.airgene.com.au%2Fproject%2Fhyperdome-upgrades)[](https://www.instagram.com/sharer/sharer.php?u=https%3A%2F%2Fwww.airgene.com.au%2Fproject%2Fhyperdome-upgrades)[](https://twitter.com/intent/tweet?url=https%3A%2F%2Fwww.airgene.com.au%2Fproject%2Fhyperdome-upgrades&text=Hyperdome%20upgrades)[](https://www.linkedin.com/sharing/share-offsite/?url=https%3A%2F%2Fwww.airgene.com.au%2Fproject%2Fhyperdome-upgrades)[](mailto:?subject=Hyperdome%20upgrades&body=https%3A%2F%2Fwww.airgene.com.au%2Fproject%2Fhyperdome-upgrades)

[

Previous

Largest networked digital EWIS installation in the Southern Hemisphere](/project/largest-networked-digital-ewis-installation-in-the-southern-hemisphere)

[Back to all projects](/experience)

[

Next

High Efficiency Equipment Upgrade](/project/high-efficiency-equipment-upgrade)

## Related Projects

[![Westmead Hospital Precinct](https://assets.precisecdn.com/cdn-cgi/image/width=480,height=300,fit=cover,quality=80,format=auto/2026_04_St_Leonards_Tafe_Navid_Hamidi_Portrait_034_LREZ.jpg)](/project/westmead-hospital-precinct)

### [Westmead Hospital Precinct](/project/westmead-hospital-precinct)

project HealthProjects

[![UVC coil lighting reducing mould](https://assets.precisecdn.com/cdn-cgi/image/width=480,height=300,fit=cover,quality=80,format=auto/UVC-1.jpg)](/project/uvc-coil-lighting-reducing-mould)

### [UVC coil lighting reducing mould](/project/uvc-coil-lighting-reducing-mould)

project CommercialRetailHealthEducation

[![Ultimo TAFE Energy Efficiency Upgrade](https://assets.precisecdn.com/cdn-cgi/image/width=480,height=300,fit=cover,quality=80,format=auto/0106_Precise_Air_Ultimo_TAFE_20thJuly_2024-.jpg)](/project/ultimo-tafe-energy-efficiency-upgrade)

### [Ultimo TAFE Energy Efficiency Upgrade](/project/ultimo-tafe-energy-efficiency-upgrade)

project EducationGovernmentProjects